Our Location Contact Us
Our Location Contact Us
Location: Home » NEWS » Tailings dry system

News

Tailings dry system

2017-06-12

tailings dry system
[process introduction]:
The tailings water content is less than 15%; the cost is 2 yuan / ton more than the traditional process system; the service life of the equipment is 2 times of the traditional process; the maintenance cost is low; the application mine has been repeatedly named as “green mine””;
[application area]:
Exhaust system is mainly used to process the concentration and dehydration tailings, tailings dry stack to achieve, so as to avoid environmental pollution, is the preferred process for implementation of green mines.

Contact Us

Please enter your inquiry and contact. We will reply you as soon as possible.

Message

  • +86-379-65160016
  • +86-379-65160018